  • New structures located in the same general location as existing structures
  • Complies with mandatory standards to ensure safety, reliability and to meet future needs
  • Replaces aging infrastructure
  • Strengthens area reliability
  • Connects renewable resources to the electric grid.

Timeline (View Full Timeline)

  • March 2024 – Project announcement mailed to neighbors
  • Spring 2024 – Project kickoff, engineering, and permitting
  • Late 2025 – Forestry activities begin on Line 218
  • Early 2026 – Begin Line 218 rebuild access installation and construction from Everetts Substation to Greenville Interconnection
  • Summer 2026 – Begin Line 25 partial rebuild and Trowbridge Substation construction
  • Early 2028 – Construction complete

Impacts

Service Interruption

Your electric service is not expected to be impacted by this project.

Traffic

There may be some traffic delays.

Noise

Noise levels will be minimal; permits are in place.

Environment

This project may have limited environmental impacts.

Neighborhood

Access to surrounding neighborhoods will not be impacted.